Lynnville-sully csd

Elementary/middle school renovation

Lynnville-Sully CSD

Elementary/Middle School Renovation

Sully, IA


Congratulations to the following companies for being awarded this project:


Bid Package #2 Demolition & Abatement

Christner Contracting Inc.


Bid Package #6 General Construction

R.G. Construction


Bid Package #6.1 Framing, Drywall, Painting & Ceilings

Hilsabeck Schacht Inc.


Bid Package #22 Plumbing & Mechanical

Dahl Air Conditioning & Heating LLC.


Bid Package #26 Electrical Systems

DeVries Electric Inc.



Pre-Bid Conference was: 

Tuesday, February 4, 2025 at 1 pm


Bid Ended: 

Tuesday, February 11, 2025 before 2 pm CST.


Refundable Deposit:

$100.00 per set with a check made out to Iowa Repro or a current MBI card.


Sets can be picked up with deposits at:

Iowa Reprographics Inc.

3 College Ave, Suite 3

Des Moines, IA 50314


Please email or call us to order plans

plans@iowarepro.com   or   515-244-5705


If you download the plans from the links below or anywhere else, please fill out the Planholder's list form so we can update you with information on this project.

Add as Planholder/Bidder form

Project Manual(download)

Drawings(download)

Addendum #1 issued 1-31-25(download)

Addendum #2 issued 2-6-25(download)

Addendum #3 issued 2-7-25(download)

Planholder/Bidder's-updated 2-11-25-12:55PM

If you have any questions regarding the project, please contact Zach Buchheit with DCI Group at 641-651-0535 or ZachB@dcigroup-us.com